News


Contract

BATCH OF INSTALLATIONS. EXPANSION AND RENOVATION OF THE PRIMARY CARE CENTRE IN SANT FRUITÓS DE BAGES.

April del 2024


Renovation and expansion project for an existing building that once housed the Municipal Library. The intervention consists of completely renovating the existing building and adding a new area for expansion. The project includes the creation of two courtyards: one that reaches the ground floor located in the expanded area, and a courtyard to illuminate the first floor in the existing area.

The main objectives to be achieved are:

  • Integrating the new area with the existing one, resulting in the full functionality of the final building.
  • Giving formal and volumetric continuity to the existing building respecting the treatment of its facades and unique elements.
  • Taking advantage of renewable energies for electricity production.
  • Being respectful of the environment by appropriately connecting with it.
  • Using local and sustainable materials.

 

Developer: Infraestructures.cat
Architects: ENSENYAT-TARRIDA Arquitectes SLP

BATCH OF INSTALLATIONS. EXPANSION AND RENOVATION OF THE PRIMARY CARE CENTRE IN SANT FRUITÓS DE BAGES.
BATCH OF INSTALLATIONS. EXPANSION AND RENOVATION OF THE PRIMARY CARE CENTRE IN SANT FRUITÓS DE BAGES.